KJ Tait

Infrastructure

Our involvement in schools includes working on projects in nursery, primary and secondary schools for both local authorities and independent schools. These projects range from the refurbishment of small classroom blocks to new school campus projects for 1,200 pupils.
Our role
On recent projects there has been a requirement for net zero carbon schools and for this we utilise dynamic simulation monitoring software to simulate zero carbon design options. There is also a move for local authority schools to be Passive House certified.

We have an in-house certified Passive House Designer who can work with Architects to assist in the engineering and thermal insulation issues associated with Passive House schemes or the Enerphit Refurbishment schemes.

Related
projects

Related News
and Thoughts

When utility costs for consuming grid electricity began to rise early last year from circa 14p/kWh to 45p/kWh (and even higher), the economics of using all the energy generated from a PV array through utilising energy storage systems began to make sense.
View more
Over the last two years we have invested heavily in training our Energy Engineers to use the IES programme Apache HVAC. This was originally so that we could offer the NABERS Design for Performance framework however we now use it as standard on all our CIBSE TM54 assessments required for BREEAM and the London Plan.
View more
1 38 39 40 41 42 68
cross