KJ Tait

Infrastructure

Our involvement in schools includes working on projects in nursery, primary and secondary schools for both local authorities and independent schools. These projects range from the refurbishment of small classroom blocks to new school campus projects for 1,200 pupils.
Our role
On recent projects there has been a requirement for net zero carbon schools and for this we utilise dynamic simulation monitoring software to simulate zero carbon design options. There is also a move for local authority schools to be Passive House certified.

We have an in-house certified Passive House Designer who can work with Architects to assist in the engineering and thermal insulation issues associated with Passive House schemes or the Enerphit Refurbishment schemes.

Related
projects

Related News
and Thoughts

London Plan 2021 is the strictest planning policy in the UK.  The Plan sets out policies for housing, transport, and the economy.
View more
Solar panels (photovoltaic (PV) panels) make up a good proportion of the energy mix in the UK over the summer months.
View more
1 2 3 64
cross