KJ Tait

Infrastructure

Our involvement in schools includes working on projects in nursery, primary and secondary schools for both local authorities and independent schools. These projects range from the refurbishment of small classroom blocks to new school campus projects for 1,200 pupils.
Our role
On recent projects there has been a requirement for net zero carbon schools and for this we utilise dynamic simulation monitoring software to simulate zero carbon design options. There is also a move for local authority schools to be Passive House certified.

We have an in-house certified Passive House Designer who can work with Architects to assist in the engineering and thermal insulation issues associated with Passive House schemes or the Enerphit Refurbishment schemes.

Related
projects

Related News
and Thoughts

Tarlair Pavilion won a Gold Award at the Scottish Design Awards on Wednesday evening in the Conservation Category. 
View more
KJ Tait are proud to have delivered the MEP design for the newly completed refurbishment at the iconic Crieff Hydro Hotel in Perthshire. 
View more
1 2 3 69
cross